Default Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!



As the titles says, Wed morning at 4am a HUGE avalanche took out over 1.5miles of high tension power transmission lines from Snettisham hydroelectric plant. This one plant accounts for 85 to 90% of Juneau's power generation system. The entire city of Juneau, all 31,000 of us, are getting our power from diesel generators and two smaller hydroelectric plants. The generators will take 100,000 gallons of fuel a day to keep up with demand and that extra fuel cost will raise our rates by 500%

We pay 0.11 per kWh now and will pay over 0.50 per kWh next month. The downed lines are in such a remote and steep place that it will be 3 months before they can fully repair it.

http://www.juneauempire.com/stories/...69314122.shtml

We've already unplugged everything that's non-essential. You wont see me on line at home nearly as often now

To top that off, we had to remove our studded tires on Tuesday and we got a foot of wet snow Thursday night! What's next, locusts?

Erich
__________________
"You need to hide like a ninja and put out a killer decoy spread..." Dave Smith
Erich_870 is offline   Reply With Quote
Old 04-18-2008, 12:31 PM   #2
Erich_870
Steelhead
 
Erich_870's Avatar
 
Join Date: Jul 2003
Location: Juneau, AK
Posts: 419
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Here's some more pics of the mountain side that let go.










Erich
__________________
"You need to hide like a ninja and put out a killer decoy spread..." Dave Smith
Erich_870 is offline   Reply With Quote
Old 04-18-2008, 12:47 PM   #3
Bloom
Tuna!
 
Bloom's Avatar
 
Join Date: Oct 2007
Location: Brookings
Posts: 1,061
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Oh man, that is devastating news. I hope they get up and running as soon as possible. No one should have to decide between food and electricity.
__________________
"I wondered why the boat was getting bigger.....then it hit me!"
Bloom is offline   Reply With Quote
Old 04-18-2008, 01:02 PM   #4
Thumper
King Salmon
 
Thumper's Avatar
 
Join Date: Jan 2001
Location: Vancouver, WA
Posts: 10,103
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Dumb question I guess, but why did they site transmission lines on that slope? With its steepness, it looks like an avalanche waiting to happen.
__________________
Jack

Please join CCA. It took 140 years to make this mess. Together we will turn it around. Please join us.

Tillamook Anglers!!! Good people doing great things!
Thumper is online now   Reply With Quote
Old 04-18-2008, 01:22 PM   #5
Lucky one
Tuna!
 
Join Date: Mar 2005
Location: Toledo OR
Posts: 1,219
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Ever been to southeast alaska? Not alot of places to run lines with out going over steep slopes
Lucky one is offline   Reply With Quote
Old 04-18-2008, 01:24 PM   #6
Erich_870
Steelhead
 
Erich_870's Avatar
 
Join Date: Jul 2003
Location: Juneau, AK
Posts: 419
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Quote:
Originally Posted by Thumper View Post
Dumb question I guess, but why did they site transmission lines on that slope? With its steepness, it looks like an avalanche waiting to happen.
There's no where else to put them. The towers are located as far out of the "normal" avalanche chutes as possible, but this one was a HUGE avalanche. They may consider the extreme cost of putting in a submarine cable, but that seems unlikely right now.

Erich
__________________
"You need to hide like a ninja and put out a killer decoy spread..." Dave Smith
Erich_870 is offline   Reply With Quote
Old 04-18-2008, 03:26 PM   #7
TheRogue
King Salmon
 
TheRogue's Avatar
 
Join Date: Apr 2000
Location: Lafayette, OR USA
Posts: 8,030
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Quote:
Duck hunting fanatic. 2005 Oregon Tech Grad in Juneau, AK working for Toner-Nordling.com - Civil and Surveying
As an Oregon Tech grad, you should be able to design and survey a much better route for this line to go!!!
__________________
Oregon Panthers girls fastpitch softball!!

TheRogue is offline   Reply With Quote
Old 04-18-2008, 03:41 PM   #8
Erich_870
Steelhead
 
Erich_870's Avatar
 
Join Date: Jul 2003
Location: Juneau, AK
Posts: 419
Default Re: Avalanche knocks out Juneau's Hydro Power, rates to increase 500%!

Quote:
Originally Posted by TheRogue View Post
As an Oregon Tech grad, you should be able to design and survey a much better route for this line to go!!!
LOL, we're eagerly hoping we can be involved with the rebuilding proecess

That's not to say they picked a bad alignment though. They definitely made lemonade with those slopes.

Erich
__________________
"You need to hide like a ninja and put out a killer decoy spread..." Dave Smith
Erich_870 is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Cast to



All times are GMT -8. The time now is 01:52 PM.

Terms of Service
Page generated in 0.08215 seconds with 10 queries